Site Map

CH601 Project

Construction Details
Rudder
Horizontal Tail
Manufacturing Ribs
Spars Construction
Outboard Wings
Part I - Skeletion
Part II-Skins
Part III-More of it
Part IV - Ailerons
Part V - Fuel Tanks
Part VI - Finishing wing
Center Wing
Skeletion
Center Wing - Bottom (skins+landing gear)
Center Wing - Seat Panel
Center Wing - On Top
Rear Fuselage
Bottom
Sides
Steps
Top Skin
Finishing
Forward Fuselage
Parts/Sub Assemlies
Joining Rear Fuselage
Initial Assembly
More Assembly
Ventilation
Interior Paint
Interior Paint
More Fuselage
Landing Gear
Landing Gear
Landing Gear
Fuel System
Parts
Cables
Instruments Panel
Design
Prototype
Construction
Selection of Instruments and Avionics
Finishing
Wiring
Finish Again
Fuel System
Center Wing
Fuselage
Firewall Forward Electrical
Battery installation
Fuel System
Shut Off Console
Fuel Lines
Subaru Engine
Disassembly
Measuring
Reduction Drive
Assembling
Installing
Intake Manifold
Ignition
Nippodenso
Hitachi/MI
Engine Mount
EA-81 Engine Pictures
Canopy
Canopy Arms
Canopy Bubble and Tube Frames
Canopy arm side covers
Canopy latching system
Cowling
Cowling Mold
Initial Fiberglass work
Joining cowls and openings
Finishing
Finish&Fly
Finishing Tail
Fuselage fairings
Backyard assembly
Airport Assembly
First Flight
Events and Projects
Other Projects
Fernand Levesque (HD)
Gilbert Martel (HDS)
Gerald Kelly (HDS)
Angelo Ferraro (HDS)
Jeff Small
Grant Corriveau (HDS)
Tony Colucci (HDS)
Dennis Carley (HD)
Fred Hulen
Beautiful CH601 (HD)
Daniel Nadeau
Visit Flypass
Other Projects
Zodiacs Tips
Other Projects
Other Planes
Life at Oshkosh
Air Venture 2001
Air Venture 2003
Events and Projects
Building from Plans
Raw Materials
Raw Materials Detail
Q&A
Why that?
The following is a hierarchical listing of all the pages in this web that can be reached by following links from the top
Michel Therrien CH601-HD Links
Michel Therrien CH601-HD Links
Tools
My 0wn Hydraulic Press
Wheel Fork Press
Construction Log

Copyright 1999, 2000 Michel Therrien. All rights reserved.
Revised: June 07, 2000 .

Home ] Up ] Construction Details ] Finish&Fly ] Events and Projects ] Building from Plans ] Raw Materials ] Tools ] Construction Log ]
e-Mail me at mtherr@yahoo.com

Counter reset on August 10, 2000 (4302 visits on main page prior to reset)
Michel Therrien, (c) 1999 - 2003.